Skip to main content

Joint TDOT/DPW Resurfacing and Restriping Project to Improve Safety and Accessibility Along Cherokee Boulevard Starts on July 27th

Jump to:

CHATTANOOGA, Tenn. —The Tennessee Department of Transportation (TDOT) is
scheduled to start resurfacing work on Sunday night, July 27th.  The
project includes both resurfacing and restriping efforts and will also
involve coordination with Norfolk Southern Railway. It is designed to
improve traffic flow, enhance road quality, and increase protection for
pedestrians, cyclists, and motorists.designed to reduce turning conflicts,
calm traffic, increase pedestrian safety, and support all modes of
transportation along this key corridor. While every precaution will be
taken to reduce the amount of disruption, motorists should be prepared for
possible temporary lane closures, flagger operations, and potential detours
during the construction period.

The project also aligns with efforts by the City of Red Bank, which is
“right-sizing” Dayton Boulevard from the Stringers Ridge Tunnel to Signal
Mountain Boulevard, continuing the vision of more balanced, multimodal
corridors throughout the region.This information is disseminated for the
residents of Chattanooga and Red Bank who utilize this essential route.

About Department of Public Works:

The Department of Public Works delivers a variety of services that
Chattanooga's citizens rely on daily. Responsibilities include the design,
construction and maintenance of the City's infrastructure; the interceptor
sewer system; the City's stormwater system; the collection and disposal of
garbage, brush, recycling, and household hazardous waste; parks
maintenance, programming and operations. Follow @CHAPublicWorks on Facebook
<https://www.facebook.com/CHAPublicWorks/> and
<https://twitter.com/CHAPublicWorks>Instagram.
<https://www.instagram.com/chapublicworks/>

Contact Us

Call
(423) 643-5950 (423) 643-5950